The project scope involved drilling and trenching of 5,000m around Donnybrook Road, Craigieburn in Melbourne’s northern suburbs in order to facilitate the local NBN rollout. The extensive length of the trench was designed for the supply and installation of three-way conduit, providing cable to a large number of households and businesses on behalf of NBN’s Delivery Partner.

A summary of the works delivery method is below:

- 9 road crossings managed as they were impacted by the drilling

- 6 NBN manholes installed

- Excavator trenching including 600m of rock hammered

- Implementation of traffic management on a key thoroughfare

- Stabilisation of all trenches while installing three-way conduit