HARCOURT BRIDGE DECK REPLACEMENT
- Date
- June 2015
- Client
- Passenger and Freight Operator
- State
- vic
Over a weekend occupation, McLeod Rail completed the replacement of a 16.5m bridge deck in Harcourt, VIC. The works included provision of safeworking, erection of scaffolding, removal of existing bridge deck, application of surface protection to the top of the steel beam flanges and construction and installation of a new steel trough deck, walkway and handrails.