Tunnel Boring Machine Rail Asset Inspection

Date
January 2019
Client
Port Owner and Manager
State
vic

McLeod Rail was engaged to complete level crossing inspections before and after the transfer of a 400 tonne Tunnel Boring Machine from a sea port to a tunnelling site. The rail asset and pavement inspections required the involvement of rail engineers, track inspectors and surveyors to establish and document asset condition before and post the movement.